In the second phase of the JongFresh project, Mustang Demolition is dismantling a greenhouse of 18,841 m². In close consultation and cooperation with the customer, we started our work before the last radishes left the greenhouse. The entire greenhouse has been professionally disassembled, so that it can be rebuilt at a later stage.
Project.
JongFresh Radijs - phase 2 - 18.841 m²
Project details.
- Cultivation
- Radish
- Area
- 18.841 m²
- Location
- Monster, The Netherlands
- Delivered
- Greenhouse demolition